Typical Projects

Sevenoaks District Council

A management service has been undertaken for the Council on a number of sportspitch renovation projects. The programmes have been controlled to a fixed budget and the selection and control of contractors and suppliers was included in the responsibility. The work has included bulk earthworks, drainage installation, final soil preparation and amelioration, establishment and maintenance.

Dale Hill Golf Club

An ongoing consultancy has been established commencing with the construction of the new Ian Woosnam course. The scope covered all aspects of construction and continues with improvements and maintenance programming.

Rietspruit Colliery, E. Transvaal, South Africa

The project included the design of surface drainage reticulation, installing erosion control measures and the establishment of perennial grass cover over replaced overburden after strip mining for coal.

The Wisley Golf Club

A detailed assessment of the earthworks, shaping and drainage installation was made of the completed golf course with a view to establishing the limiting aspects in the drainage provisions and necessary recommendations for improvement.

Parque da Floresta, Portugal

The project incorporated the design of repair work to major earth subsidence on the golf course. The responsibility included the preparation of documents and monitoring.

Swakopmund Golf Club, Namibia

Extensive tests were carried out using saline water on different strains of turf-grasses.

Deangate Ridge Golf Course

A detailed feasibility study on drainage requirements was prepared and an installation contract of £250,000 was controlled, directed and monitored through to completion.

Yardley Court School

Two large terraced sportsfields were created by cut to fill moving over 80000c.m. of material. Responsibility included the feasibility study, design and management of construction, drainage installation and seeding.

Slope Protection on Civil Engineering Sites

Extensive hydroseeding projects incorporating erosion protective measures were completed on highway and rail embankments, reclaimed mine and landfill sites.

 

Would you like more information? Please contact me