Typical Projects (2010)
Please see below a selection of typical projects undertaken in recent months and also in past years. Please do contact me with any questions you may have and I'll be happy to advise you without obligation.
St Marys High School, Cheshunt, Hertfordshire
Playing fields were established on two plateaus and incorporated facilities for athletics, cricket, football and rugby. Full documents were prepared and the contract was overseen through to establishment.
"We have worked with Gordon on a number of projects including the £32 million Gateway Acadamy Thurrock and the £28 million St Mary's CE School, Cheshunt."
"These projects involved significant sports pitch formation and modelling together with associated land drainage. Gordon is expert in his knowledge and understanding of sports pitch construction and we would not hesitate in recommending his specialist services."
David Carmichael,Senior Partner
Lyster Grillet & Harding Architects
Cyprus field : Heathfield and Waldron Rugby Club, Cross in Hand, Sussex
A feasibility study was presented, detailed drawings prepared and the construction of the new rugby pitch was overseen through to establishment.
"Gordon Jaaback was commissioned by the Heathfield and Waldron Rugby Football Club and the Heathfield and Waldron Parish Council to carry out the design and project management of the Clubs new rugby pitch at Heathfield. Despite considerable drainage problems, working with Wealden clay and a very tight budget Mr Jaaback turned one of the worst pitches in Sussex into arguably the best and on which, County matches can now be played. The pitch is simply magnificent and has been instrumental in promoting the club at all levels. The pitch was delivered on time and to budget."
P R Mercer, Club Honorary Secretary and Quantity Surveyor
London Maccabi Recreation Trust, Barnet, Hertfordshire
Feasibility study was completed for the trust and drawings and tender documents were prepared. The contract was overseen through to establishment.
"Gordon has always given us expert advice and guidance ensuring that our grass pitches are of the best quality. He led our project to build two new grass pitches and an irrigation system with enthusiasm and the utmost care and attention. The quality of the pitches, drainage and irrigation system has proved to be of an exceptionally high quality."
Dan Levy, General Manager
London Maccabi Recreational Trust Sports Club
Futures Community College, Southend on Sea, Essex
Following a feasibility study, documents were prepared for the upgrading of the existing pitch layout to include cricket nets and square in addition to football pitches. The contract was overseen to establishment.
"Planning conditions for the development of a new upper college building at Futures Community College required an appraisal of the condition of the existing playing fields. Gordon was engaged to undertake a detailed site assessment and then to implement the recommendations of his report; preparing the specifications for the works and supervising the works on site. Gordon has displayed tremendous enthusiasm, comprehensive knowledge and expertise. This, together with his fastidious attention to detail and his continuing support have produced resulting pitches that promise to be a superb asset for the College."
David Burrage, Senior Partner
HBW Partnership Chartered Surveyors
Chipstead Football Club, Sevenoaks, Kent
After a feasibility study, documents were prepared for the construction of a mini-football pitch and the contract has been overseen through establishment.
Canvey Island Junior Football Club
After completion of a feasibility study documents were prepared for a cambered pitch and the contract overseen through to completion.
"Gordon was employed to provide specialist pitch and drainage advice for the construction of a new grass football pitch in a challenging site. His knowledge and expertise has enabled the scheme to be successfully complete to a high standard and his on-going involvement has meant the maintenance regimes are being properly followed."
William Bidewell, Senior Partner
Barker Associates Property Consultants
Arnold Town Football Club, Nottingham
Following the failure in the performance of the stadium pitch a detailed investigation was carried out and a report prepared to assist in settling the dispute.
Piltdown Golf Club, Sussex
An assessment was carried out following poor growth in the spring.
Dale Hill Hotel and Golf Ltd, Ticehurst, Sussex
On-going maintenance has been monitored since the construction of the Ian Woosnam course in 1996. Recent concerns have hinged around the infestation of nematodes.
"Gordon Jaaback has been involved at Dale Hill for over 10 years. His advice and widespread knowledge and experience is and has been invaluable right from construction and grow-in of our new Ian Woosnam designed course and on the routine maintenance and project advisory basis."
Mike Mosse, Golf Course Manager
Dale Hill Hotel and Golf Limited
Dale Lawn Turf Company, Nottingham
Two years ago horses entered a turf farm and caused considerable harm in waterlogged turf. With the failure to settle the dispute expert witness reports have been prepared on both sides in preparation for the court hearing.
Radclyffe School, Oldham, Lincolnshire
With the construction of a new school in Manchester the two pitches constructed were not playable during the winter of 2009. In preparation for a court hearing a detailed investigation was carried out and a report prepared.
Bexley Sand School, Kent
Following the failure of the horse training sand school there was dispute between the owner and the contractor. A detailed investigation was carried out to assess the cause of the failure and an expert witness statement was prepared for the court.
West Finchley Bowling Club, Middlesex
Levels were established to correct uneven depressions and settlement inside the ditch boards. A renovation procedure was recommended.
Worcester Warriors Rugby Club
The stadium pitch had suffered considerably from poor drainage and grass cover was reduced to annual meadow grass. After detailed investigation of the drainage system and surface construction, recommendations were prepared for the complete renovation of the pitch.
Typical Projects (Prior to 2010)
Gateway Community College, Tilbury, Essex
The new college was developed on a flood plain and included nine playing fields. Provisions were made for athletics, cricket, football and rugby. The complex was designed, tender documents prepared and the construction was over-seen through to establishment.
Carlton Road School, Boston, Lincolnshire
After a failure to establish the school sports pitch on a landfill site, a new design incorporated a camber and narrow spaced slit drains. Documents were prepared and the contract overseen through to establishment.
Skelmersdale United Football Club, Lincolnshire
With the preparation of inadequate specifications by others there was a failure in the construction of the stadium pitch which had been relocated in Skelmersdale. There was dispute between the consultants, the contractor and the client. After investigation, an expert witness report was prepared and contributions given in a mediation.
West Essex Golf Club
Regular visits were made to the club to monitor the maintenance programme, advise and propose improvements.
Fawley Parish Council
Following an injury sustained by a player on the premier football pitch, a claim was made against the council for failure to satisfactorily complete drainage improvements prior to play. After detailed investigation an expert witness report was prepared.
Deangate Golf Club, Rochester, Kent
A detailed study of the drainage problem was undertaken and documents were drawn up for complete remediation on fairways and green approaches. The contract was overseen for the Council through to establishment.
Bushey Golf and Country Club
Drawings and specifications were drawn up for the reconstruction of all the tees and swale drainage design at the golf club. The contract was over-seen through to completion.
Schools at Somerhill, Tonbridge, Kent
A detailed study of the hill site at the new school was made. Complete drawings and documents were drawn up and the contract was over-seen through to establishment.
Elm Lane Sports grounds, Lewisham
A feasibility study was prepared and tender documents prepared. The contract was over-seen through to completion.
Leeds Castle Golf Club, Kent
Detail drawings and specifications were drawn up for a new green. The project was managed with club staff and hired plant.
Yavneh College, Borehamwood, Hertfordshire
Design documents were prepared for the construction of two football pitches together with attenuating storage trenches.
Vale da Pinta Golf Course, Carvoeiro, Portugal
A week visit was made to assess and advise in the establishment and growing in of the new course planted with selected bermuda grass hybrids.
Whitehaven Golf Course, Cumbria
The site was a reclaimed open cast coal mine site. Direction was given in the planning of the golf course layout incorporating storm water drainage design.
West Kent Golf Club, Downe, Biggin Hill, Kent
On-going maintenance management was provided including remodelling numerous tees and greens and the reconstruction of the 7th green.
Parque da Floresta, Portugal
Following the slippage of a golf green after heavy rains a new design was prepared and the construction was project managed with special attention to soil stabilisation and surface drainage reticulation.
Filton College, Bristol
A football pitch within an athletic track has become so water-logged that it could not be maintained or used. After investigation a comprehensive report was prepared and recommendations were presented.
Harlow Rugby Club, Harlow
A feasibility study was prepared for the construction of one sand stadium pitch, one synthetic grass and four soil pitches. The project incorporated provision for attenuation, water storage and irrigation installation.