Sports
Other Areas
Gordon Jaaback - Agronomist based in Kent, United Kingdom - Specialising in UK, Europe and Africa
Shortcuts: advice • assessments • construction • expert witness • maintenance • water
Typical Projects
Gateway Community College, Tilbury, Essex
The new college was developed on a flood plain and included nine playing fields. Provisions were made for athletics, cricket, football and rugby. The complex was designed, tender documents prepared and the construction was over-seen through to establishment.
St Mary’s High School, Cheshunt, Hertfordshire
Playing fields were established on two plateaus and incorporated facilities for athletics, cricket, football and rugby. Full documents were prepared and the contract was overseen through to establishment.
Cyprus field, Heathfield and Waldron Rugby Club, Cross-in-Hand, Sussex
A feasibility study was presented, detailed drawings prepared and the construction of the new rugby pitch was overseen through to establishment
Carlton Road School, Boston Lincolnshire
After a failure to establish the school sports pitch on a landfill site, a new design incorporated a camber and narrow spaced slit drains. Documents were prepared and the contract overseen through to establishment.
London Maccabi Recreational Trust
Feasibility study and design were completed for the Trust and the construction was overseen in 2010.
Dale Hill Golf Club
An ongoing consultancy has been established commencing with the construction of the new Ian Woosnam course. The scope covered all aspects of construction and continues with improvements and maintenance programming.
The Wisley Golf Club
A detailed assessment of the earthworks, shaping and drainage installation was made of the completed golf course with a view to establishing the limiting aspects in the drainage provisions and necessary recommendations for improvement.
Parque da Floresta, Portugal
The project incorporated the design of repair work to major earth subsidence on the golf course. The responsibility included the preparation of documents and monitoring.
Swakopmund Golf Club, Namibia
Extensive tests were carried out using saline water on different strains of turf-grasses.
Deangate Ridge Golf Course
A detailed feasibility study on drainage requirements was prepared and an installation contract of £250,000 was controlled, directed and monitored through to completion.
Yardley Court School
Two large terraced sportsfields were created by cut to fill moving over 80000c.m. of material. Responsibility included the feasibility study, design and management of construction, drainage installation and seeding.
Slope Protection on Civil Engineering Sites
Extensive hydroseeding projects incorporating erosion protective measures were completed on highway and rail embankments, reclaimed mine and landfill sites.
Would you like more information? Please contact me